Concrete calculator
Choose a slab, a footing, round columns or post holes, or steps, and enter the sizes. The calculator gives the concrete in cubic yards and cubic feet with waste, the number of premixed bags of any size, and tells you when a ready-mix truck makes more sense.
How the calculator works
- Volume. A slab or a footing is length × width × thickness. A round column or hole is π × (diameter ÷ 2)² × depth, less the post that stands in it, times the number of holes. Solid steps are added up step by step: under each tread, the concrete goes down to the ground.
- Waste. It adds 10 % unless you change it. The National Ready Mixed Concrete Association advises 4 to 10 % above the plan dimensions for waste, over-excavation and uneven ground.
- Cubic yards. Concrete is ordered by the cubic yard: cubic feet ÷ 27. In metric units, by the cubic meter.
- Bags. The volume divided by the yield of one bag, rounded up. An 80 lb bag of Quikrete Concrete Mix makes 0.60 cu ft, a 60 lb bag 0.45 cu ft and a 40 lb bag 0.30 cu ft. For any other bag, enter its weight and its yield; the calculator also gives the weight of all the bags.
- Mixed from cement. For your own recipe, the concrete divided by the concrete that one bag of cement makes, rounded up, gives the bags of cement. Each bag takes its buckets of sand and gravel and its water.
- Bags or truck. From 1 cu yd, the calculator points you to ready-mix, and above one truckload it counts the trucks of 8 to 12 cu yd. Enter your plant's least delivery and truck sizes to use them instead.
Worked example
A patio slab of 10 × 10 ft (3.05 × 3.05 m), 4 in (10 cm) thick.
| Step | Calculation | Result |
|---|---|---|
| Thickness in feet | 4 in ÷ 12 | 0.333 ft |
| Volume | 10 ft × 10 ft × 0.333 ft | 33.3 cu ft (0.94 m³) |
| With waste | 33.3 cu ft + 10 % | 36.7 cu ft (1.04 m³) |
| Cubic yards | 36.7 ÷ 27 | 1.36 cu yd |
| 80 lb bags | 36.7 ÷ 0.60 = 61.1, rounded up | 62 bags |
| 60 lb bags | 36.7 ÷ 0.45 = 81.5, rounded up | 82 bags |
At 1.36 cu yd, this slab is a job for a ready-mix truck: 62 bags of 80 lb are 4,960 lb (2,250 kg) to carry and mix.
With a bag that is not on the list, such as a 25 kg (55 lb) bag that makes 12.5 l (0.44 cu ft), the same slab takes 1,038 l ÷ 12.5 l = 83.1, so 84 bags, which weigh 2,100 kg (4,630 lb).
Six post holes of 12 in (30 cm) across and 3 ft (91 cm) deep, each with a 4×4 post, need 13.9 cu ft with waste, which is 0.51 cu yd or 24 bags of 80 lb, 4 bags for each hole. Three steps of 7 in, 4 ft wide, with 11 in treads and a 3 ft landing need 30.2 cu ft with waste, 1.12 cu yd.
How many bags of concrete make a cubic yard
The yield is the fresh concrete that one bag makes. It is printed on the bag, and it differs a little between products.
| Bag | Yield | Bags for 1 cu yd | Bags for 1 m³ |
|---|---|---|---|
| 40 lb (18.1 kg), Quikrete | 0.30 cu ft (8.5 l) | 90 | 118 |
| 60 lb (27.2 kg), Quikrete | 0.45 cu ft (12.7 l) | 60 | 79 |
| 80 lb (36.2 kg), Quikrete | 0.60 cu ft (17 l) | 45 | 59 |
| 20 kg, Blue Circle | 10 l (0.35 cu ft) | 77 | 100 |
| 25 kg, Sievert | 12.5 l (0.44 cu ft) | 62 | 80 |
| 40 kg, Sievert | 20 l (0.71 cu ft) | 39 | 50 |
Quikrete also sells 50 lb bags that make 0.375 cu ft, 72 for a cubic yard. One cubic yard of fresh concrete weighs about 3,800 lb (1,700 kg) at Quikrete's 140 lb per cu ft. For a bag of another brand or size, open "Your bag of concrete mix" and type the weight and the yield from the bag.
Mixing concrete from bags of cement
Cement makers print a recipe for each bag: how many buckets of sand and gravel, how much water, and how much concrete the bag makes. Open "Mix it yourself from bags of cement" and type the six numbers. In France, for example, Lafarge and Vicat give for one 35 kg (77 lb) bag of cement, at 350 kg of cement per m³ of concrete:
| Part | For one bag |
|---|---|
| Sand, 0 to 4 mm | 5 buckets of 10 l (2.6 gal) |
| Gravel, 4 to 20 mm | 8 buckets |
| Water | About 17 l (4.5 gal) |
| Concrete | About 100 l (3.5 cu ft) |
For reinforced concrete, Lafarge uses 400 kg per m³: 4 buckets of sand, 7 of gravel and about 17 l of water make about 90 l. With the 350 kg recipe, the 10 × 10 ft slab of the worked example takes 1,038 l ÷ 100 l = 10.4, so 11 bags of cement, 385 kg (849 lb), with 550 l of sand, 880 l of gravel and 187 l (49 gal) of water. Quikrete gives its portland cement only as a ratio by volume, 1 part cement to 2 parts sand and 3 parts gravel, without the water or the yield; ask the maker of your cement for its full recipe.
Bags or a ready-mix truck
- Under 1 cu yd (0.76 m³): bags. A ready-mix plant usually does not send a truck for less than a cubic yard, writes the builder John Carroll in the Journal of Light Construction.
- 1 cu yd and more: compare. Carroll mixes up to 1 1/2 cu yd himself, at about half a cubic yard per hour with a mixer. A cubic yard is 45 bags of 80 lb. A slab must be placed in one go, so count the people and the mixers before you choose bags.
- Short loads cost extra. Plants charge a fee for a load that does not fill the truck. Carroll gives about $100 for loads of 1 to 7 cu yd; the producer Cemstone charges for every load under 6 1/4 cu yd.
- More than one truck. A truck mixer holds 8 to 12 cu yd (6 to 9 m³), says the National Ready Mixed Concrete Association. Order 4 to 10 % more than the plan dimensions give, and tell the plant the final amount before the last load.
- Your plant's numbers. The least delivery and the truck sizes differ by plant and by country. Under "Your ready-mix plant", enter the numbers your plant gives, and the calculator uses them to choose between bags and a truck and to count the loads.
How thick and how deep
| Part | Size | Rule |
|---|---|---|
| Floor slab of a house, on the ground | At least 3 1/2 in (89 mm) thick, on a 4 in (10 cm) gravel base | International Residential Code, section R506, as Warren County, Kentucky, applies it |
| Footing under a house wall | At least 12 in (305 mm) wide and 6 in (152 mm) deep; wider for more floors or weaker soil | 2021 IRC, section R403.1.1 |
| Steps | Each step at most 7 3/4 in (197 mm) high, treads at least 10 in (254 mm) deep | 2021 IRC, sections R311.7.5.1 and R311.7.5.2 |
| Fence post hole | About 3 times as wide as the post, and as deep as 1/3 of the post's whole length | Quikrete |
| Any pour with bagged concrete mix | At least 2 in (50 mm) thick | Quikrete Concrete Mix |
Your local code and your plans decide the sizes of anything that carries a building. The code also sets how far the bottom of a footing lies below the ground, for example at least 24 in (61 cm) in Warren County, Kentucky. For the gravel base under a slab, use the gravel calculator; for the rise and the treads of a stair, the stair calculator.
Questions
How do I calculate how much concrete I need?
Multiply the length by the width and by the thickness, all in feet, to get cubic feet. Divide by 27 for cubic yards and add 10 % for waste. A 10 × 10 ft slab, 4 in thick, is 33.3 cu ft or 1.23 cu yd, and 1.36 cu yd with waste.
How many 80 lb bags of concrete make a yard?
45 bags. An 80 lb bag makes 0.60 cu ft, and a cubic yard is 27 cu ft. With 60 lb bags you need 60, and with 40 lb bags 90.
How many bags of concrete do I need for a fence post?
A hole 12 in across and 3 ft deep with a 4×4 post holds 2.1 cu ft of concrete. With 10 % waste, that is 4 bags of 80 lb or 6 bags of 60 lb for each post.
How much concrete do I need for a 10 × 10 slab?
At 4 in thick, 1.36 cu yd with 10 % waste, which is 62 bags of 80 lb. At 6 in thick, 2.04 cu yd.
When should I order ready-mix instead of bags?
From about 1 cu yd, which is 45 bags of 80 lb. Under that, plants seldom deliver. Ask the plant about its fee for a short load, and compare it with the price of the bags.
How much extra concrete should I order?
4 to 10 % more than the forms hold, says the National Ready Mixed Concrete Association. Ground that is not level and forms that bulge take more concrete than the plan shows, and a pour that runs short leaves a weak joint.
Sources
- Quikrete: Concrete Mix No. 1101, data sheet with bag yields, unit weight and post setting (PDF)
- Tarmac Blue Circle: Multi-Purpose Concrete, technical information with the yield of a 20 kg bag (PDF)
- Sievert: B 03 Estrich/Beton, technical data sheet with the yield of 25 kg and 40 kg bags (PDF, in German)
- Lafarge: L'Original cement, product sheet with the recipes for 25 and 35 kg bags (PDF, in French)
- Lafarge: Durabat cement, sales sheet with the recipes at 350 and 400 kg/m³ (PDF, in French)
- Vicat: Naturat cement, product sheet with the recipes in 10 l buckets (PDF, in French)
- Quikrete: Portland Cement, mix ratio for concrete
- National Ready Mixed Concrete Association: CIP 8, Discrepancies in Yield (PDF)
- National Ready Mixed Concrete Association: CIP 31, Ordering Ready Mixed Concrete (PDF)
- John Carroll: Mixing Your Own Concrete, Journal of Light Construction, 2019
- Cemstone: Dispatch guidelines 2026, partial loads (PDF)
- International Code Council: 2021 IRC residential plan review, Shums Coda Associates (sections R311.7.5 and R403.1.1) (PDF)
- Warren County, Kentucky: Building cross section, one story on a slab on grade (IRC section R506) (PDF)
- Southern Pine Inspection Bureau: Nominal vs. actual lumber sizes
Checked on 16 November 2026. Bag yields differ by product; read the yield on the bag. Slabs and footings that carry a building need the sizes that your local code and your plans give.