Enter the size of your patio, walk or driveway and the size of one paver. The calculator counts the pavers with waste for the laying pattern, and gives the gravel base and the bedding sand in cubic yards and tons, and the edge restraint with its spikes.
How the calculator works
- Area. Length × width for a rectangle, π × (diameter ÷ 2)² for a circle, or the area you type.
- Waste. It adds 5 % where whole pavers meet straight edges, and 10 % for a pattern at 45° or a round area, where every paver at the edge is cut. Type your own percentage to change it.
- Pavers. The area with waste divided by the area of one paver, rounded up. A 4 × 8 in paver covers 32 sq in, so 4.5 pavers make a square foot.
- Edge restraint. The perimeter of the area, less the length that a wall or a curb holds. The spikes stand 2 ft apart for a patio or a walk and 1 ft apart for a driveway.
- Gravel base. The base reaches 6 in (15 cm) past each restrained edge, or as far as it is deep where that is more. Its area times its depth is the compacted volume. The calculator adds 36 % to get the loose crushed stone to order.
- Bedding sand. The paved area times the sand depth, 1 in unless you change it.
- Weight. Cubic yards × the loose density: 1.35 tons per cubic yard for crushed stone and 1.42 tons for damp sand. The tons are US tons of 2,000 lb; in metric units, tonnes of 1,000 kg.
Worked example
A patio of 16 × 12 ft (4.88 × 3.66 m) that stands free in the yard gets 4 × 8 in pavers in running bond, on 4 in (10 cm) of base and 1 in (2.5 cm) of sand.
| Step | Calculation | Result |
|---|---|---|
| Area | 16 ft × 12 ft | 192 sq ft (17.8 m²) |
| With waste | 192 sq ft × 1.05 | 201.6 sq ft (18.7 m²) |
| Pavers | 201.6 × 4.5 = 907.2, rounded up | 908 pavers |
| Edge restraint | 2 × (16 ft + 12 ft) | 56 ft (17.1 m) |
| Spikes | 56 ft ÷ 2 ft | 28 spikes |
| Base area | 192 sq ft + 56 ft × 0.5 ft | 220 sq ft (20.4 m²) |
| Base, compacted | 220 sq ft × 0.333 ft | 73.3 cu ft (2.08 m³) |
| Base to order | 73.3 × 1.36 = 99.7 cu ft; ÷ 27 | 3.69 cu yd (2.82 m³) |
| Base weight | 3.69 cu yd × 1.35 tons | 4.98 tons (4.52 t) |
| Bedding sand | 192 sq ft × 1/12 ft = 16 cu ft; ÷ 27 | 0.59 cu yd (0.45 m³) |
| Sand weight | 0.59 cu yd × 1.42 tons | 0.84 tons (0.77 t) |
The sand is also 32 bags of 0.5 cu ft. If the house holds one 16 ft side, the edge restraint is 40 ft with 20 spikes, and the base is 3.56 cu yd. In herringbone at 45°, the waste is 10 % and the patio takes 951 pavers.
How many pavers per square foot
Divide 144 by the paver's length × width in inches. Makers name pavers by their nominal size, which includes the joint.
| Paver size | Pavers per sq ft | Pavers per 100 sq ft | Pavers per m² |
|---|---|---|---|
| 4 × 8 in | 4.5 | 450 | 48.4 |
| 6 × 6 in | 4 | 400 | 43.1 |
| 6 × 9 in | 2.67 | 267 | 28.7 |
| 8 × 8 in | 2.25 | 225 | 24.2 |
| 12 × 12 in | 1 | 100 | 10.8 |
| 16 × 16 in | 0.56 | 57 | 6.1 |
| 12 × 24 in | 0.5 | 50 | 5.4 |
| 24 × 24 in | 0.25 | 25 | 2.7 |
| 200 × 100 mm | 4.65 | 465 | 50 |
| 400 × 400 mm | 0.58 | 59 | 6.25 |
| 600 × 600 mm | 0.26 | 26 | 2.78 |
The exact size is a little smaller than the nominal one. Unilock's Hollandstone, a 4 × 8 in paver, measures 7 7/8 × 3 7/8 in (20 × 10 cm), and Unilock counts 4.58 of them per square foot. The Concrete Masonry and Hardscapes Association (CMHA) gives joints of 1/16 to 3/16 in (2 to 5 mm) between pavers.
Paver base depth and bedding sand
| Layer | Depth | Rule |
|---|---|---|
| Base under patios, walks and other areas for people on foot | At least 4 in (100 mm) after compaction, on soil that drains well | CMHA, PAV-TEC-002 |
| Base under a driveway of a house | At least 6 in (150 mm) after compaction, on soil that drains well | CMHA, PAV-TEC-002 |
| Base in cold climates and on wet or weak soil | Thicker than these minimums | CMHA, PAV-TEC-002 |
| Bedding sand | 1 in (25 mm), screeded and not compacted before the pavers go down | CMHA, PAV-TEC-002 |
| Pavers for patios, walks and driveways | 2 3/8 in (60 mm) thick | CMHA, PAV-TEC-002 |
| Base past the edge restraint | At least as far as the base is thick | CMHA, PAV-TEC-003 |
Use crushed stone with fines that compacts to a dense layer. For the bedding, CMHA asks for concrete sand, and warns against mason sand, limestone screenings and stone dust. Do not use the sand to level an uneven base. With 2 3/8 in pavers on 1 in of sand, the top of the base lies 3 in (75 mm) under the finished surface, so dig 7 in (18 cm) for a patio and 9 in (23 cm) for a driveway. The surface needs a slope of at least 1.5 %.
How much base and sand to order
The base depth counts after compaction, and compacted stone is denser than the loose stone a truck delivers. A research report for the Wisconsin Department of Transportation measured dense-graded base of 3/4 in at 1.80 to 1.86 tons per compacted cubic yard, and found that it takes 36 to 47 % more room when loose. The calculator adds 36 % to the compacted volume. With the loose density of crushed stone, 1.35 tons per cubic yard, that gives 1.84 tons for each compacted cubic yard. The bedding sand is spread loose, so it gets no extra.
| Material and depth | 1 cu yd covers | 1 ton covers |
|---|---|---|
| Base, 4 in (10 cm) compacted | 60 sq ft (5.5 m²) | 44 sq ft (4.1 m²) |
| Base, 6 in (15 cm) compacted | 40 sq ft (3.7 m²) | 29 sq ft (2.7 m²) |
| Bedding sand, 1 in (2.5 cm) | 324 sq ft (30.1 m²) | 227 sq ft (21.1 m²) |
The paver maker Western Interlock counts 80 sq ft for a cubic yard of gravel at 4 in, which is the volume with no extra for compaction, and 200 sq ft for a cubic yard of sand. Your supplier knows the density of its own stone; ask for it, and order the base by the ton. For gravel, sand, topsoil or mulch alone, use the gravel calculator.
Edge restraint
An edge restraint holds the pavers together. CMHA requires one along the whole perimeter of the pavers and wherever the paving changes. The wall of a building is a restraint too.
- Where it sits. On the compacted base, never on the bedding sand. The maker of Snap Edge, a plastic restraint, asks for the base to reach 6 in (15 cm) past the pavers, and CMHA asks for it to reach past the restraint by at least its own depth.
- Spikes. The maker of Snap Edge asks for a spike of 8 to 10 in every 2 ft for patios and walks, and every 1 ft where cars drive. Corners and curves take more.
- What does not work. Flat landscape edging for plant beds and soil backfill do not hold pavers, says CMHA. It also advises against timber, which warps and rots.
How many extra pavers to buy
Western Interlock adds 5 to 10 % for cuts and for spare pavers. The calculator takes 5 % for running bond, stack bond and herringbone at 90° in a rectangle, where a cut paver's other half fits the next row. It takes 10 % for herringbone at 45° and for a round area, where every paver at the edge is cut at an angle. Keep some pavers for repairs: a later batch may differ in color.
Questions
How many pavers do I need?
Divide the area by the area of one paver and add 5 to 10 % for waste. A 10 × 10 ft patio is 100 sq ft. With 4 × 8 in pavers, at 4.5 per square foot and 5 % waste, it takes 473 pavers. With 12 × 12 in pavers it takes 105.
How many 4 × 8 pavers are in a square foot?
4.5 pavers. A 4 × 8 in paver covers 32 sq in, and a square foot is 144 sq in. That is 450 pavers for 100 sq ft, before waste.
How much paver base do I need?
At least 4 in under a patio or a walk and 6 in under a driveway, after compaction. A 10 × 10 ft patio with a 4 in base, which reaches 6 in past each edge, takes 2.0 cu yd or about 2.7 tons of crushed stone.
How much sand do I need under pavers?
A layer of 1 in. For 100 sq ft, that is 8.3 cu ft: 0.31 cu yd, about 0.44 tons, or 17 bags of 0.5 cu ft. One cubic yard covers 324 sq ft.
How many pavers do I need for a 20 × 20 driveway?
The area is 400 sq ft. With 4 × 8 in pavers in herringbone at 45° and 10 % waste, it takes 1,980 pavers. The 6 in base takes about 11.1 cu yd or 14.9 tons of crushed stone, and the sand 1.2 cu yd.
Can I lay pavers on sand alone?
No. The sand is a bed of 1 in that the pavers settle into. The load goes to the compacted base of crushed stone below it. CMHA gives 4 in of base as the least for a patio or a walk.
Sources
- Concrete Masonry and Hardscapes Association: PAV-TEC-002, Construction of Interlocking Concrete Pavements, revised 2022
- Concrete Masonry and Hardscapes Association: PAV-TEC-003, Edge Restraints for Interlocking Concrete Pavements, revised 2022
- Concrete Masonry and Hardscapes Association: Proper concrete paver base and depth
- Snap Edge: Installation specifications, base past the edge and spacing of the spikes (PDF, at Mutual Materials)
- Western Interlock: Paving stone installation guide, waste and coverage
- Unilock: Hollandstone, sizes and stones per square foot (PDF)
- Wisconsin Department of Transportation: Weight-Volume Relationships and Conversion Factors for Soils and Aggregates of Wisconsin, report 0092-22-05 (PDF)
- Caterpillar: Material density tables to help estimate earthwork volumes
Checked on 15 November 2026. Depths are minimums for soil that drains well; wet or weak soil, frost and heavy vehicles need a thicker base. The weight of stone and sand changes with the quarry and the water in it.